📝 Bikram Lock Canal Solar Project – Bihar

  • Project Name: Bikram Lock Canal Solar Project.
  • Inauguration Date: June 10, 2025.
  • Location: Bikram Lock Canal.
  • Inaugurated By: Bihar CM Nitish Kumar.
  • Capacity: 2 MW (green energy plant).
  • Funding Model: Built at no cost to the state (self-financed/PPP model implied).
  • Associated Scheme: Developed under the JalJeevan-Hariyali Abhiyan (a state environment mission).
  • Land Use: Utilises canal-side land (efficient use of non-agricultural space).
  • Cost of Energy: Produces clean energy at ₹3.10 per unit for 25 years (low and stable cost).
  • Key Benefits:
    • Boosts renewable energy generation.
    • Reduces carbon emissions.
    • Ensures affordable rural electrification.
    • Strengthens sustainable development in Bihar.
Scroll to Top